November 15, 2018

Plans for London’s Enderby Wharf cruise terminal abandoned

The leader of Greenwich council has confirmed plans to build a cruise terminal at Enderby Wharf in Greenwich have been abandoned. In a statement, Danny Thorpe […]
November 12, 2018

PLA River Thames high-tech survey vessel named

The new boat, named Thame, will use the latest technology to detect potential danger and ensure that the River Thames is safe for vessels Deputy Mayor […]
October 25, 2018

Freight on the rise as Thames Vision strategy starts to bear fruit

A 40% surge in the volume of freight moved between wharves on the Thames is reported in a new Port of London Authority (PLA) update on […]
October 25, 2018

PLA ‘topping off’ of 50-metre high Northfleet Radar Tower

Last week saw the ‘topping off’ of the 50-metre high Northfleet Radar Tower, when a 140-tonne telescopic mobile crane lifted the radar’s top platform into place. […]